Patina Pair #2

IMG_0001 IMG_0003 IMG_0004 IMG_0005 IMG_0002

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This patina took two full days. A day for creating a new solution for holding this set to the table so it can fit out the shop more easily, then sandblast, and chemical etching applied and scrubbed out. Today was color. This method takes a lot of time and chemical mix- I’ll need to buy more Cupric Nitrate for the last group. They still need spots and eyes brought back to bronze, waxed, and the poles polished. The triple school is next. They will also need a new solution to affix to the table as it is a full foot taller. I will weld up a little platform below the level of the table just high enough not to drag on the ground when going over the gap btwn the garage and the driveway. The logistics of working large really slow things down…

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s