Archive

Monthly Archives: December 2017

DSC07171

Floodgate Closed.

Ready for New Years’ Eve now that the Ibis is complete. Patina went well and he is a nicely layered French Brown toning from reds to golds to chocolate. He wandered around the yard and I took pictures as he explored.

DSC07169

Floodgate Open.

DSC07175

“Back” side.

DSC07172

Twinkle in his eye.

DSC07173

Skinny front view.

DSC07176

DSC07178

Waterfall Floodgate; would be a perfect addition to the yard.

DSC07179

A heart of falling water.

DSC07180

Wings folded along his back.

DSC07181

Strolling about.

DSC07184

Nesting area?

Ibis Floodgate

Ibis Floodgate!

Advertisements
DSC07155

Head sprouts overnight.

Last night’s snow squall convinced me to wait ’til things warmed up in the afternoon before rolling the shop door open for welding. 34 degrees and breezy was warm enough for the Ibis.

DSC07164

Blending in the weld from bird to square tubing.

I laid it all flat on the table, and aligned the head/neck and tacked the neck in place then stood it up to double check. Then it was on to welding with the Argon tank showing empty, but hissing along for all the day’s welds. With the weld line finished, it was on to metal chase. Still some finessing left on that front, but well enough for today.

DSC07159

This view offers the trademark curve of the Ibis bill.

DSC07167

Chasing the sun.

DSC07165

Skinny bird.

DSC07163

Nora frisks about to ask if it can finally be walkie time, then waits impatiently as I snap off a few pictures after shutting things down.

DSC07141

Gate skinned with bronze tubing.

Monday and Tuesday were spent welding the stainless watergate together, then adding the outside border of 1″ bronze tubing. Cutting the tubing from an 8′ length down to all the paired sets was a bit woozy for how close the math was vs. how expensive a mistake would be. Then I welded the pairs together, then welded them to the gate. Today I stood the legs up after welding on their anchor pins for installation, went back into the watergate to capture a slew of tweaks, then brought the gate together with the legs.

DSC07142

1″ square tubing, doubled. The open ends will be resolved tomorrow.

 

DSC07144

Before welding the legs to the gate, I weld in the anchor pins for basing and tack-weld the pins to a platform of stainless and wood.

DSC07145

I used all the leftover parts from the watergate!

DSC07147

From this side it levitates.

DSC07148

Spent awhile putting a bevel on the top L edge (allows the backward bend of the neck) and welding the ends closed, then fixing pinch-points for little fingers, plus a few last structural overkills.

DSC07149

The headless birdman.

DSC07151

Narrow front view.

DSC07152

Walking out the studio would be foolish funny bird; snowstorm out there.

DSC07153

The “back” profile. Tomorrow is chasing the connective weld, and seeing if I run out of Argon gas while trying to fit the head.

DSC07113

Stainless Steel Waterman Floodgate.

The floodgate for the Ibis is a Waterman C10 in Stainless Steel and cast iron. Tweak #1 was cutting it shorter. Tweak #2 (after complete disassembly) was repainting the 5 cast iron parts. Tweak #3 was grinding all the Stainless to a clean surface, then cutting the threaded SS lift rod and cleaning it’s nose and end. Then reassemble. I ordered bronze square tubing from Denver that is waiting out in the studio for the next step: cutting it to fit and welding it to the stainless (also welding all the stainless parts together and tack-welding all the bolts). Eventually the bronze Ibis head and legs will weld on as well.

DSC07116
Gate sized down and refitted.
DSC07118

Nora stands in for scale.

DSC07139

SS ground clean and cast iron parts repainted.

DSC07138

Lift rod cut to size too.

DSC07140

A chilly day in the shop with Orange Air Quality (pm2 @ 141, nearly Red).